Project of water intake site, Reutov

The reconstruction project of water intake site in Reutov.
 
The maximum flow rate of 400 m³ / h.
 
Design objects:
 
- Two water wells;
 
- Redeveloped pumping station II-nd lift;
 
- Two monolithic reinforced concrete tanks of 3,000 m³.